Mold ready to shape the sides of the keel Ballast
Lead running out of the melting box. The rough surface is the lead actually bubbling as steam escapes from the concrete boiled out by the hot lead. This one one pour was 1230 pounds of lead. One more pour and we will have one side of the Ballast completed and ready to assemble with the tandem fins after the other side has been formed.
https://sites.google.com/site/marazulles/pictures-exterior?pli=1
Lead running out of the melting box. The rough surface is the lead actually bubbling as steam escapes from the concrete boiled out by the hot lead. This one one pour was 1230 pounds of lead. One more pour and we will have one side of the Ballast completed and ready to assemble with the tandem fins after the other side has been formed.