MarAzul
LongShip
- Joined
- Sep 28, 2008
- Messages
- 21,370
- Likes
- 7,281
- Points
- 113
Molding the mold to cast the Ballast. A slurry of Bentonite and beach sand is tamped around a wooden pluck the shape the ballast and left to dry. The remaining void is then filled with sand and a floor board is screw over the mold. The whole assemble is turn over and the top board removed. The the wooden plug is removed and if all is well, the mold is ready to receive the molten lead.
The forward fin in the background ready to be added to the ballast assembly.
